{"id":4209,"date":"2026-04-13T16:25:00","date_gmt":"2026-04-13T14:25:00","guid":{"rendered":"https:\/\/ibsh.hu\/?p=4209"},"modified":"2026-09-23T16:32:29","modified_gmt":"2026-09-23T14:32:29","slug":"ipcei-process","status":"publish","type":"post","link":"https:\/\/ibsh.hu\/en\/ipcei-process\/","title":{"rendered":"The IPCEI Process: From Concept to State Aid Agreement"},"content":{"rendered":"<p class=\"wp-block-paragraph\">From the outside, the <strong>IPCEI process<\/strong> may easily look like a very large-scale state aid application. In reality, it is far more complex. <a href=\"https:\/\/ibsh.hu\/en\/ipcei-en\/\">IPCEI \u2013 Important Project of Common European Interest<\/a> \u2013 is a state aid framework that allows EU Member States to finance strategic industrial projects in compliance with EU state aid rules.<\/p><p class=\"wp-block-paragraph\">In recent years, IPCEI programmes have been launched in areas including <strong>semiconductors, batteries, hydrogen, cloud and edge infrastructure, and healthcare<\/strong>. New strategic fields, such as artificial intelligence and biotechnology, are also becoming increasingly prominent in European industrial policy thinking.<\/p><p class=\"wp-block-paragraph\">The stakes are significant: individual projects may receive several hundred million euros, and in some cases even several billion euros, in public co-financing. Just as important, however, is the strategic validation provided by the European Commission: recognition that the project forms part of a broader European interest. That kind of \u201cseal of approval\u201d simply cannot be bought.<\/p><p class=\"wp-block-paragraph\">What is less visible from the outside is just how <strong>long, structured and decision-intensive the IPCEI process can be<\/strong>. Below, we explain how a potential IPCEI project progresses from an initial industry concept to the signing of a state aid agreement.<\/p><h2 class=\"wp-block-heading\">1. Identifying the Market Failure<\/h2><p class=\"wp-block-paragraph\">Every IPCEI process starts with a clearly documented <strong>market failure<\/strong>. The fundamental question is why the market, on its own, would not finance the technology or value chain at the scale or speed Europe requires.<\/p><p class=\"wp-block-paragraph\">This may be due, for example, to high technological risk, very substantial upfront investment needs, long payback periods, or the fact that a significant share of the project\u2019s positive effects accrue beyond the investing company itself.<\/p><p class=\"wp-block-paragraph\">This rationale is typically developed by the coordinating Member States, industry participants and experts from the European Commission. It forms the foundation of the entire IPCEI. <strong>If the market failure case is weak, the project will be difficult to defend during the later Commission assessment.<\/strong><\/p><h2 class=\"wp-block-heading\"><strong>2. JEF Approval to Enter the Design Phase<\/strong><\/h2><p class=\"wp-block-paragraph\">The next key step is the<a href=\"https:\/\/competition-policy.ec.europa.eu\/state-aid\/ipcei\/joint-european-forum-ipcei_en\" target=\"_blank\" rel=\"noopener\"> <strong>Joint European Forum for IPCEI<\/strong><\/a><strong>, or JEF-IPCEI<\/strong>. This is where Member State representatives and the Commission discuss whether a given strategic area \u2013 such as artificial intelligence or computing infrastructure \u2013 should move into the design phase.<\/p><p class=\"wp-block-paragraph\">This is an important green light, but it should not be confused with a funding decision. No state aid is awarded at this stage. The decision simply means that the detailed design of the relevant IPCEI can begin.<\/p><h2 class=\"wp-block-heading\"><strong>3. Design Phase: Scope, National Calls and Matchmaking<\/strong><\/h2><p class=\"wp-block-paragraph\">During the design phase, participating Member States define the project\u2019s <strong>scope, sub-projects, technological focus and eligibility criteria<\/strong>. The Commission\u2019s IPCEI Design Support Hub may also provide support during this stage.<\/p><p class=\"wp-block-paragraph\">At the same time, national authorities launch calls for expressions of interest \u2013 for example in the form of a <strong>Manifestation of Interest, or MoI<\/strong> \u2013 through which companies can indicate their intention to participate.<\/p><p class=\"wp-block-paragraph\">This is also where matchmaking begins. Applicants look for partners in other Member States with whom they can build a genuinely integrated, cross-border project. In many cases, such cooperation is formalised through a <strong>Letter of Intent<\/strong>.<\/p><p class=\"wp-block-paragraph\">From a management perspective, this is the first major decision gate. Is there a credible European consortium? Does the project genuinely fit the IPCEI logic? Can the requested amount of state aid be robustly justified?<\/p><h2 class=\"wp-block-heading\"><strong>4. National Selection<\/strong><\/h2><p class=\"wp-block-paragraph\">In the next stage, each Member State assesses the projects submitted to it and selects those it intends to take forward with national co-financing.<\/p><p class=\"wp-block-paragraph\">National selection is therefore a <strong>necessary but not sufficient condition<\/strong>. A selected company does not automatically become a state aid beneficiary. It simply progresses to the next, significantly more detailed stage of European assessment.<\/p><h2 class=\"wp-block-heading\"><strong>5. Pre-Notification: The First Real Stress Test<\/strong><\/h2><p class=\"wp-block-paragraph\">Before the formal notification comes the <strong>pre-notification<\/strong> stage, meaning preliminary discussions with the European Commission. At this point, Member States informally test with the Commission whether the project genuinely meets the IPCEI criteria.<\/p><p class=\"wp-block-paragraph\">The assessment covers, among other things, <strong>genuine EU added value, the level of private co-financing, spillover effects extending beyond the direct beneficiaries, and the incentive effect<\/strong>.<\/p><p class=\"wp-block-paragraph\">The latter is particularly important: the state aid must genuinely contribute to making the investment happen. It cannot simply provide additional funding for a project that would have gone ahead anyway, at the same time, in the same location and at the same scale.<\/p><p class=\"wp-block-paragraph\">Based on our experience, this iterative exchange is particularly important because <strong>a significant proportion of issues tend to surface at this stage<\/strong>, before the project is formally submitted to the Commission.<\/p><h2 class=\"wp-block-heading\"><strong>6. Commission Assessment<\/strong><\/h2><p class=\"wp-block-paragraph\">The European Commission\u2019s Directorate-General for Competition, <strong>DG COMP<\/strong>, assesses the project in detail against the relevant IPCEI criteria.<\/p><p class=\"wp-block-paragraph\">Among other things, it examines the project\u2019s contribution to EU strategic objectives, its cross-border nature, its level of ambition, the proportionality of the state aid, and whether distortions of competition are kept to a minimum.<\/p><p class=\"wp-block-paragraph\">This is typically one of the <strong>longest and most documentation-intensive stages of the process<\/strong>. At this point, legal, financial and economic precision is essential; general strategic arguments alone are no longer sufficient.<\/p><h2 class=\"wp-block-heading\"><strong>7. Formal Notification<\/strong><\/h2><p class=\"wp-block-paragraph\">Once the preliminary discussions have been completed, the participating Member States formally notify the state aid measure to the European Commission under <strong>Article 107(3)(b) of the Treaty on the Functioning of the European Union (TFEU)<\/strong>.<\/p><p class=\"wp-block-paragraph\">At this stage, the project developed during the design phase formally becomes a state aid case.<\/p><h2 class=\"wp-block-heading\"><strong>8. Commission Approval Decision<\/strong><\/h2><p class=\"wp-block-paragraph\">The Commission may then approve the individual projects and the related state aid amounts through a formal decision \u2013 either in full, in part, or subject to specific conditions.<\/p><p class=\"wp-block-paragraph\">The decision is public and sets out the <strong>maximum amount of state aid<\/strong> that may be granted to each beneficiary. This amount represents a ceiling and is not necessarily identical to the amount the company will ultimately receive.<\/p><h2 class=\"wp-block-heading\"><strong>9. Signing the State Aid Agreement<\/strong><\/h2><p class=\"wp-block-paragraph\">The actual contractual stage only begins once Commission approval has been obtained.<\/p><p class=\"wp-block-paragraph\">The agreement concluded between the national granting authority and the beneficiary sets out the project milestones, the <strong>payment schedule, reporting and monitoring obligations, and, where applicable, the conditions under which state aid may be recovered<\/strong>.<\/p><p class=\"wp-block-paragraph\">This is the point at which the IPCEI moves from a strategic and policy initiative into a contractually enforceable programme. From here, the project enters implementation \u2013 along with the accountability obligations that come with the use of public funds.<\/p><h2 class=\"wp-block-heading\">How Long Does the IPCEI Process Take?<\/h2><p class=\"wp-block-paragraph\">From a management perspective, this is perhaps one of the most important questions. <strong>Based on our own experience and on previous IPCEI waves in batteries, hydrogen, microelectronics and other sectors, the full process typically takes well over a year and, in many cases, can extend to two or three years.<\/strong><\/p><p class=\"wp-block-paragraph\">In recent years, there has been a clear push to accelerate the process. Member States, participating companies and the European Commission itself have all called for faster procedures. Even so, IPCEI is unlikely to become a process that can be completed within just a few months.<\/p><p class=\"wp-block-paragraph\">Companies considering participation should therefore look beyond the expected amount of state aid. They also need to plan for multi-year internal resource requirements, financial and technical modelling, legal work and sustained management involvement.<\/p><h2 class=\"wp-block-heading\">Conclusion: IPCEI Should Be Managed as a Series of Decision Gates<\/h2><p class=\"wp-block-paragraph\">The <strong>IPCEI process<\/strong> is not one long state aid application. It is better understood as a sequence of interdependent decision gates, each with its own costs, evidentiary requirements and exit options.<\/p><p class=\"wp-block-paragraph\">For management, the same question should therefore be revisited at every major stage: <strong>do the project\u2019s business value, expected state aid and European strategic positioning justify the resources required to move to the next step?<\/strong><\/p><p class=\"wp-block-paragraph\">Companies that recognise this early are able to navigate the IPCEI process much more deliberately. Those that approach it simply as a large state aid application may only discover the true requirements after significant internal resources have already been committed.<\/p><p class=\"wp-block-paragraph\">If you would like to assess whether your company and project are ready for the IPCEI process, request our <strong>IPCEI Readiness Assessment<\/strong>.<\/p>","protected":false},"excerpt":{"rendered":"<p>From the outside, the IPCEI process may easily look like a very large-scale state aid application. In reality, it is far more complex. IPCEI \u2013 Important Project of Common European Interest \u2013 is a state &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"The IPCEI Process: From Concept to State Aid Agreement\" class=\"read-more button\" href=\"https:\/\/ibsh.hu\/en\/ipcei-process\/#more-4209\" aria-label=\"Read more about The IPCEI Process: From Concept to State Aid Agreement\">Read more<\/a><\/p>","protected":false},"author":2,"featured_media":4210,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":"","_ppma_block_editor_authors":"{\"authors\":[358],\"author_categories\":{\"358\":\"1\"},\"fallback_author_user\":\"1\",\"ppma_author_box_select\":\"\",\"selected_authors\":[{\"id\":358,\"display_name\":\"Kov\u00e1cs-Dob\u00e1k G\u00e9za\",\"is_guest\":0,\"category_id\":\"1\"}]}"},"categories":[326],"tags":[359],"ppma_author":[153],"class_list":["post-4209","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-grants","tag-ipcei","infinite-scroll-item","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"lang":"en","translations":{"en":4209,"hu":4206},"authors":[{"term_id":153,"user_id":2,"is_guest":0,"slug":"ibsh","display_name":"ibsh","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/8d56e3375bc4b106e530edb5550eb5967c79c50d489ab35f9e33f11621bd97d6?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/posts\/4209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/comments?post=4209"}],"version-history":[{"count":1,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/posts\/4209\/revisions"}],"predecessor-version":[{"id":4211,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/posts\/4209\/revisions\/4211"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/media\/4210"}],"wp:attachment":[{"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/media?parent=4209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/categories?post=4209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/tags?post=4209"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/ibsh.hu\/en\/wp-json\/wp\/v2\/ppma_author?post=4209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}